Y96 Dragonfly Glass Pack - 96 COE

$53.95 USD
Only 10 left in stock - order soon.
In Stock
Usually ships in 1 to 2 business days.

  • Iridized coatings add a beautiful sheen
  • Good for stained glass, mosaics and fusing
  • 6 pieces, 6" x 6" each
  • Pack includes striker glass - color shifts when fired
  • 96 COE

Product Description

Y-96 glass is crisp and vibrant, making it a favorite of glass artists. Iridized coatings add a beautiful rainbow sheen making it perfect for wings, highlights, accents and details. Contains 6 pieces, 6" x 6" each. Good for stained glass, mosaics and fusing. Texture may be lost if fused. 96 COE.

Note: Pack includes strikers. Glass color shifts when fired.

Glass pieces are marked with item numbers for easy reordering. Pricing includes boxing charge. Photo is one example; actual glass may vary. Sizes are approximate.

Project by artist Jody Skopick. From Delphi's Online Artist Gallery.

Delphi Tip: Clean Y-96 glass thoroughly with a non-ammonia glass cleaner before firing to get a smooth, gloss finish in your fired art. Cap with clear for an extra glossy finish.

Y-96 Recommended Firing Schedules

Delphi Tip: We recommend using a project and firing log to keep track of information about your projects and firing schedules can be an extremely useful tool for every artist. Once you've achieved a good result you can reference the logs to re-create the project or simply re-use a firing schedule for a similar project. Click here to download our free firing log.
 

Full Fuse
Segment Rate Temperature Hold/Minutes
1 300°F/hr 1000°F 10
2 300°F/hr 1250°F 20
3 300°F/hr 1425°F 15
4 Full (9999) 950°F 60
5 200°F/hr 800°F 10
6 300°F/hr 150°F  
Tack Fuse
Segment Rate Temperature Hold/Minutes
1 300°F/hr 1000°F 10
2 300°F/hr 1250°F 20
3 300°F/hr 1350°F 10
4 Full (9999) 950°F 60
5 200°F/hr 800°F 10
6 300°F/hr 150°F  
Slump Fuse
Segment Rate Temperature Hold/Minutes
1 300°F/hr 1000°F 30
2 200°F/hr 1225°F 10
3 Full (9999) 950°F 60
4 200°F/hr 800°F 10
5 300°F/hr 150°F  
*All kilns are not alike. Your kiln size, controller type, and  individual  project may require some alteration to the schedule for best results.